Build · 01 · New Dock Construction

From bare seawall to your first cast

We lay out the dock around how you actually use the water: fishing, boating, sitting with a coffee at sunrise. Then we drive the pilings from the barge and build it to shrug off sun, salt and storm season.

Owner-operated5.0 on Google, 98 reviewsServing 13 SWFL communities
Where it starts

An empty seawall is wasted water

You bought waterfront to be on the water. Without a dock, the canal behind your house is scenery: nowhere to tie up, nowhere to fish from, nowhere for the kids to jump in. A dock is the difference between owning a view and using one.

The catch is that a dock is a structure standing in salt water, in Florida, through storm season. Built casually, it becomes a maintenance bill. Built right, with the pilings deep, the hardware rated for salt and the deck sized to your boat, it just quietly works for decades.

That second kind is the only kind we build. The owner lays it out with you on your seawall, and the same crew that drove the pilings hands it back finished.

A platform deck built for how the owners live
A platform deck built for how the owners live
What is included

Every job covers

01

Layout and design on your seawall

We plan the dock around your boat, your canal and how you will use it, walkway, platform, lift well and all, before anything is ordered.

02

Pilings driven from the water

The barge sets every piling straight and deep from the canal side. No equipment through your yard, no torn-up lawn.

03

Composite or marine-grade decking

Composite for zero staining and color that survives the sun, or pressure-treated marine pine as the budget workhorse. We quote both when it is a close call.

04

Salt-rated hardware

Fasteners and connectors specified for salt water, with hidden-fastener patterns available where you want a clean deck face.

05

Permit guidance

We scope the build around Lee County and City of Cape Coral dock rules and walk you through the permit steps before a single piling moves.

06

Owner walkthrough at splash

The build ends with the owner on your dock, boat in the water, going over every board and bolt with you.

How it goes

From layout to splash

01

Walk the seawall

The owner meets you at the water, free. You talk boats, layout and budget; he tells you what your canal and seawall can take.

02

Design & permit

The dock gets drawn around your answers, and we walk you through the permit steps so the paperwork is moving before the build starts.

03

Drive and build

Pilings go in from the barge, straight and deep. Frame, stringers and decking follow, checked as they go.

04

Splash

Final walkthrough with the owner, boat tied to your new cleats. You are on the water and we are a phone call away.

From our jobs

Real work, real water

Every photo is our own work on SW Florida water. Click any of them to look closer.

What canal owners say

Rated 5.0, 98 reviews

“Hiring Alex and his crew was a great decision! First and foremost they showed up when they said they would and perhaps even more important, finished when they said they would. ... I only wish I'd hired Alex from the start.”
Vince Kotlarz · Google
Read all 98 on Google Quotes shown verbatim from public Google reviews. Ellipses mark trimmed passages only.
Field notes · decking

The board matters less than the bones

Owners agonize over composite color and board brand, and fair enough, it is the part you see and walk on every day. But what decides how long your dock lasts is underneath: how deep the pilings are set, how the stringers are sized and spaced, and whether the hardware was rated for salt water or just for a backyard fence.

So that is where we put the obsession. Get the bones right and either decking choice will serve you well. Get them wrong and the prettiest board in Florida will not save the dock under it.

Composite vs pressure-treated, honestly
CompositeCosts more up front. No staining, no splinters, color holds in full sun. The low-maintenance pick for barefoot decks.
Pressure-treated pineThe budget workhorse. Wants periodic sealing, weathers grey, and still the right call for plenty of working docks.
Either wayThe frame, pilings and fasteners under the boards are what decide how long the dock lasts. That part is never optional.
Straight answers

New Dock Construction questions

Your seawall is ready when you are

Tell us your canal and what you are dreaming about. The owner will come walk the seawall, free, and tell you exactly what it takes to build it.

Open 7 AM to 7 PM, 7 days a week · Call or text