New Dock Construction · Captiva
A Captiva dock starts with a boat ride
Out here the shoreline has no truck route behind it, so the build gets planned around the water instead of around a driveway. Pilings, framing and decking arrive on the barge, and the layout gets drawn for the Sound side you actually look at.
Building where the road runs out
Captiva is a barrier island north of Sanibel, across Blind Pass, and the docks sit on the protected Pine Island Sound side with Roosevelt Channel running between the island and Buck Key. That geography decides two things about a new build before anyone talks about decking color: where the material comes from, and what the water in front of you does all day.
The material question sounds like the hard one and is not. We build from the barge everywhere we work, so a shoreline reachable only by water is the normal version of our job. What it does change is sequencing. Loads get planned so each run across the Sound carries what that stage of the build needs, and the whole dock gets designed in one pass rather than discovered piece by piece.
The water question is the one worth your attention. Open Sound fetch builds a real chop when the wind sets up, and channel traffic keeps wake moving past your pilings. So the layout gets drawn around that: where the walkway meets the shoreline, which side the boat ties on, how deep the pilings go, and whether the lift well belongs in the plan now instead of later. The owner walks it with you at the water, free, before anything is ordered.
Every job covers
Layout and design on your seawall
We plan the dock around your boat, your canal and how you will use it, walkway, platform, lift well and all, before anything is ordered.
Pilings driven from the water
The barge sets every piling straight and deep from the canal side. No equipment through your yard, no torn-up lawn.
Composite or marine-grade decking
Composite for zero staining and color that survives the sun, or pressure-treated marine pine as the budget workhorse. We quote both when it is a close call.
Salt-rated hardware
Fasteners and connectors specified for salt water, with hidden-fastener patterns available where you want a clean deck face.
Permit guidance
We scope the build around Lee County and City of Cape Coral dock rules and walk you through the permit steps before a single piling moves.
Owner walkthrough at splash
The build ends with the owner on your dock, boat in the water, going over every board and bolt with you.
Real work, real water
Every photo is our own work on SW Florida water. Click any of them to look closer.
Rated 5.0, 98 reviews
“Alex and his workmanship was above what I had expected ... I would highly recommend him and his team with any other customer. 10 star rating. Along with being very fairly priced.”Lou Luongo · Google
Captiva questions
Roosevelt Channel is a normal workday
Most people out here assume the island is the complicated part. It is not. The run up the Sound is a normal workday, the free inspection happens the way it would on any mainland canal, and the only thing that really changes is the view from your shoreline.
Open 7 AM to 7 PM, 7 days a week · Call or text
CC 