Dock Repair & Re-Decking · Bokeelia
Hard use shows up in the boards
A dock that gets walked, loaded and tied to every day ages faster than one that gets admired. We take up the tired boards, fix what is under them, and lay a deck that can take the same treatment again.
Read the wear before you buy boards
Boards on a Bokeelia dock do not wear evenly, because they do not get used evenly. Docks on Pine Island's north end earn their keep daily, and the wear map tells you exactly where the work happens: the path from the yard to the boat, the spot where gear gets set down, the run alongside the cleats that takes wet boots and everything dragged across it all year. Sun and salt handle the rest of the deck at their own slower pace. What you end up with is one dock aging at two different speeds.
Hardware is the other tell. Open water on three sides, Charlotte Harbor to the north, Matlacha Pass to the east and Pine Island Sound to the west, keeps everything out here damp and salted, and fasteners are usually the first thing to quietly give up. A screw backing out, a connector weeping rust, a board that feels loose even though it looks fine. Sometimes that is nothing more than spent hardware. Sometimes it means the stringer underneath has softened and there is nothing left for the screw to bite into.
Which is why the boards decide very little and what is under them decides everything. Alex works the deck end to end, free, testing where the traffic is heaviest first, then gets underneath to read the stringers and see what the salt has left of the pilings. Then you hear it plainly: a repair, a fresh deck on a frame that is still carrying its load, or a rebuild that has to start below the water. If it is a re-deck, the tear-off and the haul-off both happen from the barge, so old boards and spent fasteners leave by water instead of stacking up in your yard. Scope decides whether paperwork gets involved, and we scope the work around Lee County dock rules and walk you through the permit steps.
Every job covers
Full tear-off of the old deck
Boards and spent fasteners come up and go on the truck. With the deck off, the frame is finally visible, which is the only honest way to know what you are dealing with.
Frame and stringer repairs
Soft stringers get replaced, sound ones get re-fastened, and anything the years got to is fixed while it is open. This is the part that decides how the new deck feels underfoot.
New composite or pressure-treated decking
Composite for zero staining and color that survives full sun, or marine-grade pressure-treated pine as the budget workhorse. We quote both when it is a close call.
Salt-rated hardware throughout
Fasteners and connectors specified for salt water go back in place of whatever corroded out. Hidden-fastener patterns are available where you want a clean deck face.
Picture-frame borders and clean edges
A framed border around the perimeter hides the board ends and makes an old dock read as new. Corners, trim and lift cutouts get finished the same way.
Old material hauled off
Every board, screw and offcut leaves with us, by barge where the water is the easy route. You get the dock back clean and ready to walk on.
Real work, real water
Every photo is our own work on SW Florida water. Click any of them to look closer.
Rated 5.0, 98 reviews
“I'm a pretty particular person when it comes to Detail and Alex and his crew gave very great attention to detail. The best I've seen. Love my Dock and couldn't be happier with the results.”Duane Needham · Google
Bokeelia questions
Keep the dock in service
A dock you use every day should be out of commission for the shortest stretch the job allows, and that starts with knowing the real scope. The free look separates spent hardware from a soft stringer, and the schedule gets built around how you actually use the thing.
Open 7 AM to 7 PM, 7 days a week · Call or text
CC 