Dock Repair & Re-Decking · St. James City
A working dock wears in patches
Decks down here rarely give out all at once. They give out where you step aboard, where the gear lands and where the rinse water sits. We sound the whole deck, read the frame under it, and treat the parts that are still good as still good.
The deck tells on how you boat
A dock at the south end of Pine Island earns its keep, because open water is a short run out the canal and the boat goes. That use leaves a map on the boards. The stretch by the lift well and the boarding spot has taken every wet step and every cooler that got set down hard, while the far end of the same dock still looks close to new. Owners read that as one bad patch. It is usually the first honest reading you have had of the whole structure.
Wear on top is the cheap kind, though, and it is not what decides the job. That happens underneath: the stringers, the joints they sit in, and the pilings at the waterline where marine growth and borers work out of sight. So the owner starts under the deck, free, and works up to the boards last. A stringer and piling set that still stands true means new boards go straight on top and the job stays small. Play in the joints or thinning at the waterline changes the scope, and the owner tells you which one you have before a single board comes off.
Then we plan the work around a dock that is still in service. The lift keeps its own pilings and holds its place while the boards come off around it, the gap around it gets closed up neatly when the new deck goes down, and the tear-off rides away on the barge instead of stacking up on your shoreline. The whole job runs from the canal side, which is the easy route to a south end lot anyway.
Every job covers
Full tear-off of the old deck
Boards and spent fasteners come up and go on the truck. With the deck off, the frame is finally visible, which is the only honest way to know what you are dealing with.
Frame and stringer repairs
Soft stringers get replaced, sound ones get re-fastened, and anything the years got to is fixed while it is open. This is the part that decides how the new deck feels underfoot.
New composite or pressure-treated decking
Composite for zero staining and color that survives full sun, or marine-grade pressure-treated pine as the budget workhorse. We quote both when it is a close call.
Salt-rated hardware throughout
Fasteners and connectors specified for salt water go back in place of whatever corroded out. Hidden-fastener patterns are available where you want a clean deck face.
Picture-frame borders and clean edges
A framed border around the perimeter hides the board ends and makes an old dock read as new. Corners, trim and lift cutouts get finished the same way.
Old material hauled off
Every board, screw and offcut leaves with us, by barge where the water is the easy route. You get the dock back clean and ready to walk on.
Real work, real water
Every photo is our own work on SW Florida water. Click any of them to look closer.
Rated 5.0, 98 reviews
“Alex, and crew were able to get the job done quickly (when other contractors were months out). ... My dock is now finished and I could not be happier! I would highly recommend Alex for your dock building needs.”John Anderson · Google
St. James City questions
One walk covers the whole deck
Every board, the lift well and the pilings get covered in the same visit, and it costs you nothing. Call or text (239) 834-0095, 7 AM to 7 PM, 7 days. If the far end of your dock is still good, you hear that too.
Open 7 AM to 7 PM, 7 days a week · Call or text
CC 