Dock Repair & Re-Decking · Fort Myers
Read the dock before you replace it
Fort Myers docks age at the pace of the water in front of them. Open Caloosahatchee frontage works a frame harder than a back canal ever will, and it shows in the fasteners and stringers long before the boards look finished. The owner sounds the deck first, free, and the verdict comes off the frame, never off the boards.
River water ages a dock from underneath
A dock on the open Caloosahatchee is never completely still. Wake rolls in most of the day, chop builds whenever the wind gets a long run at your frontage, and the whole structure takes a small working motion over and over and over. Sun and salt do the visible damage from above, but that steady movement is what backs fasteners out, opens up connections, and turns a solid deck into one that talks back when you walk it.
Then there is the waterline. The river swings with the tide, so the band where wood goes wet and dry, then wet again, is wider than it would be on still water, and that band is where the serious aging happens: on the pilings and the lower framing, out of sight from up on the boards. It is why a Fort Myers deck can look evenly tired across the whole dock and still turn out to be two or three different conditions once the boards come off.
Back on the canal streets the water is calmer, the same dock ages slower, and the boards genuinely are the job more often than not. Either way the verdict comes off the frame, never off the deck. The owner comes across from Cape Coral for that, free, and on river frontage most of the visit happens with his head under the deck: connections, stringer ends, and the wide wet band the tide leaves on the pilings. Whatever it adds up to, a repair, a re-deck or a fix that starts below the water, you hear it before any material gets ordered.
Every job covers
Full tear-off of the old deck
Boards and spent fasteners come up and go on the truck. With the deck off, the frame is finally visible, which is the only honest way to know what you are dealing with.
Frame and stringer repairs
Soft stringers get replaced, sound ones get re-fastened, and anything the years got to is fixed while it is open. This is the part that decides how the new deck feels underfoot.
New composite or pressure-treated decking
Composite for zero staining and color that survives full sun, or marine-grade pressure-treated pine as the budget workhorse. We quote both when it is a close call.
Salt-rated hardware throughout
Fasteners and connectors specified for salt water go back in place of whatever corroded out. Hidden-fastener patterns are available where you want a clean deck face.
Picture-frame borders and clean edges
A framed border around the perimeter hides the board ends and makes an old dock read as new. Corners, trim and lift cutouts get finished the same way.
Old material hauled off
Every board, screw and offcut leaves with us, by barge where the water is the easy route. You get the dock back clean and ready to walk on.
Real work, real water
Every photo is our own work on SW Florida water. Click any of them to look closer.
Rated 5.0, 98 reviews
“Alex and his workmanship was above what I had expected ... I would highly recommend him and his team with any other customer. 10 star rating. Along with being very fairly priced.”Lou Luongo · Google
Fort Myers questions
Book the look before you order boards
The owner crosses the Caloosahatchee, spends as much of the visit under the deck as on top of it, and charges nothing for the trip. Mention whether you are on open river frontage or back in a canal when you reach out and he will know what to bring.
Open 7 AM to 7 PM, 7 days a week · Call or text
CC 