Dock Repair & Re-Decking · Estero
The boards are the last thing we look at
On tidal water a dock wears in a band, not evenly all over. We sound the deck, read the frame underneath and study the zone the water keeps crossing, then tell you straight whether the fix stops at the boards or starts lower down.
Shallow water leaves a tide line
A dock on the Estero River or the east side of Estero Bay stands in water that comes and goes. That leaves a band on every piling and every low member that is wet, then dry, then wet again, all day, in salt. Add the hard growth this bay is known for and that band ends up being the hardest working part of your dock and the part you can see the least of from up on the deck.
Which is why the boards tell you so little out here. Full sun over open bay water finishes a deck on its own schedule, whether the structure under it is sound or not. A grey, splintery deck can sit on a frame that is perfectly fine. A handsome deck can sit on pilings that have gone thin right where the tide crosses them. The only way to know which one you own is to get under the deck and put eyes on the waterline.
So that is the order the work happens in: sound the deck, read the stringers and the frame, clean and check the growth band on the pilings, and only then talk about boards. The owner makes that walk himself, free. Old material leaves by barge and new material comes in the same way, inside the tide window, so nothing heavy crosses your yard in either direction.
Every job covers
Full tear-off of the old deck
Boards and spent fasteners come up and go on the truck. With the deck off, the frame is finally visible, which is the only honest way to know what you are dealing with.
Frame and stringer repairs
Soft stringers get replaced, sound ones get re-fastened, and anything the years got to is fixed while it is open. This is the part that decides how the new deck feels underfoot.
New composite or pressure-treated decking
Composite for zero staining and color that survives full sun, or marine-grade pressure-treated pine as the budget workhorse. We quote both when it is a close call.
Salt-rated hardware throughout
Fasteners and connectors specified for salt water go back in place of whatever corroded out. Hidden-fastener patterns are available where you want a clean deck face.
Picture-frame borders and clean edges
A framed border around the perimeter hides the board ends and makes an old dock read as new. Corners, trim and lift cutouts get finished the same way.
Old material hauled off
Every board, screw and offcut leaves with us, by barge where the water is the easy route. You get the dock back clean and ready to walk on.
Real work, real water
Every photo is our own work on SW Florida water. Click any of them to look closer.
Rated 5.0, 98 reviews
“Alex, and crew were able to get the job done quickly (when other contractors were months out). ... My dock is now finished and I could not be happier! I would highly recommend Alex for your dock building needs.”John Anderson · Google
Estero questions
Book it inside a tide window
Work out here happens inside a tide window, so the earlier we hear about your dock, the easier the visit is to slot in. Alex reads the growth band on the pilings himself, at no charge, before anybody talks about boards.
Open 7 AM to 7 PM, 7 days a week · Call or text
CC 